Solution: TSS and CCTV monitoring with automatic intervention, for construction sites under Earth Control Measures.See how it works
A construction site discharge point: clear treated water falls from a pipe with a blue-painted end into a drain, watched by a CCTV camera, beside a stainless control cabinet.
TSS & CCTV monitoring for ECM · Automatic intervention

TSS and CCTV monitoring for Earth Control Measures.

When the TSS reading goes over 50 mg/L, the system shuts the treatment plant down, diverts the silty water to the holding pond and sends an alert to your phone. The CCTV is linked to PUB’s Silt Imagery Detection System. We install it and keep it calibrated for the life of your project.

On PUB’s list of CCTV vendorsFor construction sites under Earth Control Measures.
The requirement

PUB’s rules for silt leaving a site.

Earth Control Measures (ECM) are PUB’s requirements for keeping silt from construction sites out of the drains, waterways and reservoirs.

01

Silt and flooding

Silt washed off exposed earth settles in drains and waterways after heavy rain. It reduces how much stormwater the drains can carry, which raises the risk of flash floods. Two-thirds of Singapore's land area is water catchment, so silty water can reach the reservoirs.

Source: PUB, Earth Control Measures
02

The ECM plan comes first

The contractor engages a Qualified Erosion Control Professional (QECP) to design the site's ECM plan. The contractor submits the endorsed plan to PUB. The measures must be in place before any earthwork starts.

Sources: PUB, Code of Practice on Surface Water Drainage, clause 6.3.3 · SCAL-PUB ECM guidebook, Annex 1
03

The discharge limit

Water discharged into a public drain must not contain more than 50 mg/L of total suspended solids.

Source: PUB press release, 8 November 2024
04

CCTV linked to SIDS

Sites of 0.2 hectares and above must have CCTV at the public drain, linked to PUB's Silt Imagery Detection System. SIDS analyses the snapshots for silty discharge.

Source: PUB, Silt Imagery Detection System
This page summarises PUB’s requirements. The full detail is in PUB’sCode of Practice on Surface Water Drainage and the SCAL-PUB guidebook Erosion & Sediment Control at Construction Sites (6th edition, 2026). Your Qualified Erosion Control Professional decides what applies to your site.
The system

The system stops silty water reaching the drain.

A TSS sensor reads the treated water continuously. Above 50 mg/L, the system acts at once, day or night, and alerts your ECM staff.

Below the limitNormal
24mg/L
Limit
50 mg/L
Treatment plant
Running
Motorised valve
To the public drain
Discharge to the drain
Flowing
Beacon and sounder
Off
Alert to your phone
None
Treated water discharges to the public drain.
Above the limitIntervention
78mg/L
Limit
50 mg/L
Treatment plant
Shut down
Motorised valve
Diverts to the holding pond
Discharge to the drain
Stopped
Beacon and sounder
On
Alert to your phone
Sent
When the reading falls back below 50 mg/L, power to the treatment plant comes back on and discharge resumes.
The readings shown are examples. The system acts at 50 mg/L, PUB’s limit for discharge to a public drain. PUB’s sample tender specification asks for treatment systems with automated intervention, such as automatic shut-down and diversion to a holding pond with a motorised valve.
Installation

The parts of the system.

We supply, install and commission the system at your discharge point, then calibrate and check it through the life of your project.

01
TSS sensor

Sits in the treated water and reads suspended solids continuously.

02
CCTV camera and night lighting

Set up to PUB's SIDS requirements: a clear view of the discharge pipe, white LED lighting at night, and a snapshot to SIDS every 5 minutes.

03
Motorised valves

Divert silty water to the holding pond when the reading goes over 50 mg/L.

04
Control panel

Logs the readings, shuts the treatment plant down and sends the SMS alerts.

05
Beacon and sounder

Show and sound the alarm on site.

06
Solar panel and battery

Keep the CCTV camera running continuously, so its snapshots keep reaching SIDS.

The AIF system: a stainless control panel on a stand with a TSS meter, indicator lamps and selector switches, a beacon alarm and a solar panel on top, a TSS sensor on a cable, a motorised butterfly valve, and a CCTV camera.
Illustration · Not to scale
Records and alerts

What the system records.

TSS readings and CCTV snapshots are stored for the whole project.

Continuous record

TSS readings are logged around the clock, including nights, weekends and storms.

Alerts on your phone

An SMS goes to the people you name when the reading goes over 50 mg/L.

Snapshot archive

CCTV snapshots are kept by date and time. PUB can ask for 14 days of snapshots, to be supplied within 3 working days.

Users

Contractors, site staff and erosion control professionals.

Construction sites that discharge treated water to a public drain.

Main contractors

Responsible for ECM on the site, including the CCTV PUB requires.

ECM officers and site staff

Get an alert to act on at any hour, with the readings and snapshots to check.

Qualified Erosion Control Professionals

Specify treatment and monitoring that match the ECM plan.

Common questions

Questions before you enquire.

Ask anything else in your enquiry.

What are Earth Control Measures?

Earth Control Measures (ECM) keep silt from a construction site out of Singapore's drains, waterways and reservoirs. The contractor engages a Qualified Erosion Control Professional to design the site's ECM plan and submits it to PUB. The measures must be in place before any earthwork starts.

What is the discharge limit?

50 mg/L of total suspended solids, for water discharged into a public drain. Our system acts at this limit.

What happens when the reading goes over 50 mg/L?

The treatment plant shuts down, the motorised valve diverts the silty water to the holding pond, the beacon and sounder come on, and an alert goes to your phone. When the reading falls back below 50 mg/L, power to the treatment plant comes back on and discharge resumes.

Does my site need CCTV?

Yes, if the site is 0.2 hectares or more. The CCTV must watch the discharge point at the public drain and be linked to PUB's Silt Imagery Detection System.

What does PUB require of the CCTV?

A clear view of the discharge pipe, painted with a blue marker, and white LED lighting at night. A snapshot goes to SIDS every 5 minutes, and snapshots are archived. PUB treats an offline camera or a faded marker as downtime.

Do you install it, or only supply it?

We supply, install and commission the system, then calibrate and check it through the life of your project.

Related

Check your treated water on the spot.

Portable meter

MD50 Suspended solids

A portable meter to check your treated water before it reaches the drain.

View the MD50
Products

Turbidity and suspended solids

Handheld and laboratory instruments for turbidity and TSS.

Browse instruments

Ask for a quotation.

Tell us about your site. We will reply with the cost to install the system and to keep it running.

Enquire about this systemCall +65 6276 3383